Home > The Barge > Design

Layout

This plan is modified from the original drawn in 1998 when she was converted.


Wheelhouse view through double doors

The key changes that we have made are:

  • New galley
  • Revised and enlarged main cabin and bathroom
  • Revised aft cabin including double bed, new bathroom and wc
  • Saloon revisions including multi fuel stove, new roof lights
  • General power upgrade with 6kW Victron inverters for house 230V AC supply
  • Complete 230V rewire
  • Installation of 1200 litre holding tank
  • Exterior repaint 2009/10
 
Search
QR Code